
22-12-04, 04:28 PM
|
| Banned | |
Join Date: Nov 2003 Location: Siddington (Glos)
Posts: 2,666
| |
Quote: | Originally Posted by Conor Now extended for
decanting (calculates final pressure when decanting between trwo cylinders and a guesstimate of mix)
Time to Surface (calculates air and time required to get up from a depth for a given ascent rate, stop time and remaining time at bottom).
This has been a lot easier than I thought, will try and have a look at the ddPlan thing if someone can point me in the right direction.
Cheers
Conor | http://www.ddplan.com/ |