Quote:
| Originally Posted by JohnD I know lots of pros and cons. just wanted to hear other peoples advice. for the 2 or 3 minutes at 1.6 (or slightly over) the CNS loading isnt too bad wouldnt want to do it for longer though, on the profile I planned it gets me out of the water 8 minutes earlier. PRO & CON! |
Wooo. Can you quote a plan showing 2 or 3 mins at 1.6 saving 8 mins total deco over 1.4 please. I'm having problems envisaging one. Maybe I'm missing something.
I tend to plan with 1.3 as it's a YBOD and then boost toward 100% at 6m giving 1.5 and a bit and call it conservatism. But then I'm talking half an hour plus not 2 or 3 minutes.
nigelH